2nd Quarter Project Updates

Posted by Amy Berger on 8/5/2020

19034.011 – Renovation at Wood Middle School
Project Status:
Light renovation through various parts of the school, total renovation of front classroom cluster, relocation of office and
creation of new classrooms and maker space. Energy efficiency upgrades, life cycle replacement and the addition of an
educational greenhouse.
This project is scheduled for construction during the summer and fall 2021.
The project is in the Design Development stage of design.

Light pole      19042.019 Sports Field Relighting at Wilsonville High School 
     Project Status:
     Sports field lighting replacement for the stadium, baseball fields and three tennis courts. The varsity softball field has already received this upgrade, and the JV softball field will receive the upgrade as part of another project. The contractor is on board, and most of the work has been completed. The final two fixtures will be replaced this fall, when Osprey are absent from this location.

 

19043.006 - Track Replacement at Athey Creek Middle School Track
Project Status:
This project is substantially complete.

19045.009 – Security @ BF, LW
Project Status:
This project includes security upgrades at these two
schools. The work has been design, bid and the work
is underway. The work is expected to be substantially
complete for the start of the school year in August 2020.

     19044.009 – Security @ COP, RR, ST  Secure Entry
     Project Status:
     This project includes security upgrades at these three
     schools. The work has been design, bid and the work is
     underway. The work is expected to be substantially complete
     for the start of the school year in August 2020.

19046.004 – Flooring @ ST  Flooring
Project Status:
This project includes the abatement of existing
flooring materials, and the installation of new
carpet and vinyl flooring for classrooms and support
spaces. The abatement is complete and installation
of the flooring is underway.


19048.009 – Mechanical @ WLHS, WM
Project Status:
This project includes a boiler replacement at West Linn High
School and the gym mechanical unit replacement at Willamette
Primary School. This equipment was routinely failing and so
immediate replacement is underway. The project has been
designed, bid and is underconstruction in preparation for start
of school this fall.


19049.009 – Renovations at Bolton Primary School and Cedaroak Park Primary School  
Project Status:
This project includes classroom air conditioning,
security improvements and other life cycle replacement
work. Design is currently underway with an expected
construction start in summer 2021.


19050.009 – Renovations at Stafford Primary School and Willamette Primary School
Project Status:
This project includes classroom air conditioning,
security improvements and other life cycle replacement
work. Design is currently underway with an expected
construction start in summer 2021.