District-wide projects
District-wide projects would include the following:
- Renovate second gym at Boones Ferry Primary to serve as district-wide robotics space
- Furniture, Fixtures & Equipment
- Tree and Swale restoration and maintenance
- Update Curriculum
- Technology infrastructure updates
- School display technology & sound amplification
- Communication upgrades, Wi-Fi refresh, phone, radio & intercom system updates
- Access control/secure entry/security upgrades/video monitoring/security glazing
- Window blinds/shades replacement
- Safety compliance, roof rigging & stage curtain replacements
- Intrusion-limiting glass
- Gym basketball backboards inspected and serviced as needed
- Second standby generators to supplement emergency system
-
Boeckman Creek Primary
2025 Capital Bond Projects at Boeckman Creek Primary include:
Single Occupant Restroom with room for assist ADA ramp to stage
Access route improvements from classroom to outdoors
Repair preschool playground natural area
Replace playground equipment with inclusive equipment and install accessible play surfacing
Health room expansion
Site Fencing
Replace emergency generator
Roofing replacement
Select restroom refreshes
Select HVAC improvements
Boiler replacement
Student and staff technology equipment & devices
-
Bolton Primary
2025 Bond Projects at Bolton Primary would include:
Single Occupant Restroom with room for assist Access route improvements from classroom to outdoors
Replace playground equipment with inclusive equipment and install accessible play surfacing
Roofing replacement
Select restroom refreshes
Boiler vent replacement
AC for the MDF and IDF rooms
Site Fencing
Student and staff technology equipment & devices
-
Boones Ferry Primary
2025 Bond Projects at Boones Ferry would include:
Single Occupant Restroom with room for assist
Replace playground equipment with inclusive equipment and install accessible play surfacing
Relocate MDF & IDF rooms
Student and staff technology equipment & devices
Keyscan upgrade/building lockdown improvements
Select roofing repairs
Exterior woodwork repair
New trash compactor and drain
New fire alarm system
Select restroom refreshes
Select HVAC improvements
Sidewalk replacement rebuild
Gym lighting replacement in both gyms
-
Cedaroak Park Primary
2025 Bond Projects at Cedaroak Park Primary would include:
Select sidewalk replacement & asphalt play area repair
Single Occupant Restroom with room for assist
Replace playground equipment with inclusive equipment and install accessible play surfacing
Keyscan upgrade/building lockdown improvements
Site Fencing
Select roofing replacement
Select HVAC improvements
Select Plumbing upgrades
Exterior painting & canopy renovations
Student and staff technology equipment & devices
-
Lowrie Primary School
2025 Capital Bond Projects at Lowrie Primary would include:
Single Occupant Restroom with room for assist
Install accessible play surfacing & replace select equipment
Acoustic wall panel replacement in library & gym
Restroom faucets replacement
Select HVAC improvements
Gym lighting replacement
Site Fencing
Student and staff technology equipment & devices
-
Stafford Primary School
2025 Capital Bond Projects would include:
Single Occupant Restroom with room for assist
Replace gym scoreboard
Install accessible play surfacing & replace select equipment
Complete interior lighting upgrades
Select roofing replacement
Fire pumps replacement
Replace fire alarm
Select restroom refreshes
Select HVAC improvements
Parking lot patch and repair
Site Fencing
Student and staff technology equipment & devices
-
Sunset Primary School
2025 Capital Bond Projects at Sunset Primary would include:
Single Occupant Restroom with room for assist
New sidewalk with plantings between classrooms and gym for ADA route
Install accessible play surfacing
Refinish exterior wood
New kitchen dishwasher
Plumbing vault drain pump upgrade
Student and staff technology equipment & devices
-
Trillium Creek Primary School
2025 Capital Bond Projects at Trillium Creek Primary would include:
Single Occupant Restroom with room for assist
Install accessible play surfacing & replace select equipment
Acoustic wall panel replacement in the library and gym
Restroom faucets replacement
Select HVAC improvements Gym lighting replacement
Student and staff technology equipment & devices
Site Fencing
-
Willamette Primary School
2025 Capital Bond Projects at Willamette Primary would include:
Single Occupant Restroom with room for assist
Renovate elevator space at lower levels
Replace playground equipment and existing turf with new
Upgrade interior lighting to LED
Select roofing replacement and roof access improvements
Pressure wash and paint exterior building
Replace flooring in cafeteria
Select HVAC improvements
Replace plumbing fixtures in classrooms and restrooms
Rebuild parking lot
New kitchen dishwasher Site Fencing
Student and staff technology equipment & devices
-
Athey Creek Middle School
2025 Capital Bond Projects at Athey Creek Middle School would include:
- New student and staff technology equipment and devices for Athey Creek
- District-wide emergency communication system upgrades
- Turf replacement at Rosemont Ridge Middle School
- Turf replacement at West Linn High School
- Turf installation for main athletic field at Meridian Creek Middle School and Riverside High Schools
- District-wide robotics center at Boones Ferry Primary
-
Inza Wood Middle School
2025 Capital Bond Projects at Inza Wood Middle School would include:
Single Occupant Restroom with room for assist
ADA access from classrooms to the exterior
Refinish Gym floors
Replace bark chip wellness paths with accessible hardscape paths
Upgrade interior lighting to LED
Student and staff technology equipment & devices
Roof access connection between different levels
Paint exterior doors
Roofing replacement
Select HVAC improvements
Replace drinking fountains
Add power to floorboxes in library
Select Plumbing upgrades
-
Meridian Creek Middle School
2025 Capital Bond Projects at Meridian Creek Middle School would include:
Single Occupant Restroom with room for assist
Install accessible play surfacing & replace select equipment
Synthetic turf & lights installation on main athletic field, new track and concessions/restroom building
Acoustic work in porches
Science room gas shut off control upgrade
Student and staff technology equipment & devices
-
Rosemont Ridge Middle School
2025 Capital Bond Projects at Rosemont Ridge Middle School would include:
Single Occupant Restroom with room for assist
Replace chair lift with elevator
Replace main gym scoreboard
Install lighting for athletic field flag pole
Upgrade softball field lighting to LED
Upgrade main athletic field lighting to LED
Replace softball field synthetic turf
Replace main athletic field synthetic turf
Install accessible play surfacing & replace select equipment
Softball dugouts upgrades and expansion
Keyscan upgrade/building lockdown improvements
Student and staff technology equipment & devices
Roofing and gutter replacement and additional roof access added
New trash compactor
Replace fire alarm
Replace reception casework
Select HVAC improvements
Select Plumbing upgrades
Sidewalk repair by concessions building and front sidewalk trench drain
-
Riverside High School
2025 Capital Bond Projects at Riverside High School would include:
Single Occupant Restroom with room for assist
Elevator Replacement
Synthetic turf and lights installation on main athletic field and track improvements
Stadium with restrooms, announcers booth & covered bleacher seats
Upgrade interior lighting to LED
Repair building waterproofing behind brick
Select roofing replacement & additional access
Kitchen update - paint, guards, new walk in cooler
Fire pumps replacement
Weight room doors replacement
Repair stage floor
Select HVAC improvements
Replace all drinking fountains Additional parking
Student and staff technology equipment & devices
-
West Linn High School
2025 Capital Bond Projects at West Linn High School include:
Single Occupant Restroom with room for assist
ADA access from classrooms to the exterior
Resurface tennis courts
Resurface track
Upgrade lighting at baseball field and tennis courts
Replace main stadium athletic turf
Replace select performance sound, lighting and camera equipment in PAC
Replace PAC house lighting
Student and staff technology equipment & devices
Create secure entry vestibule
Replace main wrestling spotlights in gym
Select roofing replacement and walk pads
New trash compactor
New kitchen dishwasher
Select restroom refreshes
Basement level flooring replacement & painting
Replace carpet in classroom wing and offices
Select HVAC improvements
Replace shower fixtures in locker rooms
Replace bottle fillers
Select plumbing upgrades
Gym lighting replacement in Aux gym Additional parking lot at corner of West A & McKilican St.
-
Wilsonville High School
2025 Capital Bond Projects at Wilsonville High School would include:
Single Occupant Restroom with room for assist
Resurface tennis courts
Upgrade tennis court lighting
Resurface track
Upgrade softball field lighting to LED
Replace softball field turf
Replace main stadium athletic turf
Renovate stadium restrooms
Improve stadium accessible seating
Upgrade stadium lighting over seating area
Create ADA access along stadium bowl to field level Softball & baseball dugouts upgrades and expansion
Create secure entry vestibule
Student and staff technology equipment & devices
Select roof replacement and improved roof access
New trash compactor
Select HVAC improvements
Replace exterior drinking fountains
Replace bottle fillers
Add flag pole and lighting at baseball field
Repair and re-pave south parking lot
Rebuild parking lot between WHS & BC
Parking lot build out by new softball field